You are here: HomeNews2024 02 21Article 1918037

General News of Wednesday, 21 February 2024

    

Source: www.ghanaweb.live

GWL attributes erratic water supply in Kumasi to unstable power at treatment plants

Ghana Water Limited (GWL) Ghana Water Limited (GWL)

Ghanaian

Ghana Water Limited (GWL) has attributed the inconsistent water supply in the Greater Kumasi Metropolis to the unstable power supply affecting three of its key stations in the Ashanti Region.

The Barekese and Owabi Water Treatment Plants, along with the Achiase Booster Station, have faced power o35423220utages in recent weeks, resulting in difficulties producing and transmitting potable water to consumers.


Read full article